← All templates

Quality, safety & admin

FMEA template (China)

A general template under the law of the People's Republic of China (mainland). The Chinese text governs; the English is its translation. Some rules differ from city to city, so check it with a lawyer licensed in China. We are not a law firm and do not give legal advice.

Fill in this template
  • Written for Chinese law, in Chinese and English
  • Fill the blanks in your browser
  • Print or save as PDF; Word is 15 points
  • Start right away, sign in to download

Preview — China standard

Failure Mode and Effects Analysis (FMEA)

ItemDetails
OrganizationOrganization Name
SubjectProduct or Process Name
TypeDesign or Process
Document No.Document No.
Team LeaderTeam Leader
Team MembersTeam Members
Prepared OnPreparation Date
Revised OnRevision Date

Scoring: severity, occurrence and detection are each rated 1 to 10 (10 is most severe, most frequent or hardest to detect); Risk Priority Number (RPN) = severity × occurrence × detection. Any item with an RPN of Action Threshold or more, or a severity of 9 to 10, must have an improvement action.

1. Analysis

No.Process Step or ComponentFailure ModeEffectSeverityCauseOccurrenceCurrent ControlsDetectionRPNRecommended ActionOwner and Due Date
1Process Step or Component 1Failure Mode 1Effect 1Severity 1Cause 1Occurrence 1Current Controls 1Detection 1RPN 1Recommended Action 1Owner and Due Date 1
2Process Step or Component 2Failure Mode 2Effect 2Severity 2Cause 2Occurrence 2Current Controls 2Detection 2RPN 2Recommended Action 2Owner and Due Date 2
3Process Step or Component 3Failure Mode 3Effect 3Severity 3Cause 3Occurrence 3Current Controls 3Detection 3RPN 3Recommended Action 3Owner and Due Date 3
4Process Step or Component 4Failure Mode 4Effect 4Severity 4Cause 4Occurrence 4Current Controls 4Detection 4RPN 4Recommended Action 4Owner and Due Date 4
5Process Step or Component 5Failure Mode 5Effect 5Severity 5Cause 5Occurrence 5Current Controls 5Detection 5RPN 5Recommended Action 5Owner and Due Date 5
6Process Step or Component 6Failure Mode 6Effect 6Severity 6Cause 6Occurrence 6Current Controls 6Detection 6RPN 6Recommended Action 6Owner and Due Date 6

2. Re-evaluation After Action

No.Action TakenNew SeverityNew OccurrenceNew DetectionNew RPN
Re-evaluation No. 1Action Taken 1New Severity 1New Occurrence 1New Detection 1New RPN 1
Re-evaluation No. 2Action Taken 2New Severity 2New Occurrence 2New Detection 2New RPN 2

Prepared by (signature): Preparer Signature Reviewed by (signature): Reviewer Signature Approved by (signature): Approver Signature

Fill it in and download →

Frequently asked questions

Do I need an account to use this template?

Start right away and fill it in in your browser; signing in is needed to download or print. It takes seconds, and every new account gets free points.

How do I save it once filled in?

Fill in the blanks online, then print it or save it as PDF. An editable Word file is 15 points.

Are my files private?

Your files are kept in private storage no one else can reach, and are deleted from the servers automatically within two days at most.

Related templates