← All templates

Construction & contracting

Method statement template

Fill in this template
  • 4 designs, Arabic and English
  • Fill the blanks in your browser
  • Print, or save as PDF or Word
  • No account needed to start

Preview — Organised table

Method Statement

Date: Date

Details

| Item | Details |

| --- | --- |

| Project | Project |

| Activity | Activity |

| Reference Number | Reference Number |

| Revision | Revision |

| Prepared By | Prepared By |

Scope and references

| Item | Details |

| --- | --- |

| Scope of Work | Scope of Work |

| Reference Specs and Drawings | Reference Specs and Drawings |

Resources

| Item | Details |

| --- | --- |

| Team and Responsibilities | Team and Responsibilities |

| Equipment | Equipment |

| Materials | Materials |

Steps

| No. | Step | Description | Responsible |

| --- | --- | --- | --- |

| 1 | Step 1 | Description 1 | Responsible 1 |

| 2 | Step 2 | Description 2 | Responsible 2 |

| 3 | Step 3 | Description 3 | Responsible 3 |

| 4 | Step 4 | Description 4 | Responsible 4 |

| 5 | Step 5 | Description 5 | Responsible 5 |

| 6 | Step 6 | Description 6 | Responsible 6 |

Safety and quality

| Item | Details |

| --- | --- |

| Hazards and Controls | Hazards and Controls |

| PPE | PPE |

| Inspection and Hold Points | Inspection and Hold Points |

Contractor: Contractor

Consultant: Consultant

Approval: Approval

Fill it in and download →

Related templates