← All templates

Hospitals & healthcare

Lockout-tagout permit template (US)

A general template under US law. Laws differ from state to state, so check it against your state's law or with a lawyer licensed there. We are not a law firm and do not give legal advice.

Fill in this template
  • Written for US law, with your state left to fill in
  • Fill the blanks in your browser
  • Print or save as PDF; Word is 15 points
  • Start right away, sign in to download

Preview — US standard

Lockout/Tagout Energy Control Permit

Permit number: Permit Number

Date: Date

Equipment: Equipment Name and ID

Location: Location

Work to be done: Description of Service or Maintenance

Authorized employee in charge: Authorized Employee Name

Affected employees notified: Names or Departments

Equipment-specific procedure number: Procedure Number

Energy Sources

Energy TypeMagnitudeIsolation Device and LocationLock No.Tag AppliedVerified Zero Energy
ElectricalVoltageDisconnect and LocationLock 1YesYes, Method
PneumaticPressureValve and LocationLock 2YesYes, Method
HydraulicPressureValve and LocationLock 3YesYes, Method
Gravity or stored mechanicalDescriptionBlock or PinLock 4YesYes, Method
Thermal or chemicalDescriptionIsolationLock 5YesYes, Method

Lockout Steps

1. Notify affected employees.

2. Shut down equipment by normal stopping procedure.

3. Isolate all energy sources.

4. Apply a personal lock and tag for each authorized employee.

5. Release or restrain stored energy.

6. Verify isolation by attempting to start the equipment, and test with a meter where needed; return controls to off.

Workers Locked On

NameLock NumberTime OnTime OffSignature
Worker 1Lock 1On 1Off 1Signature 1
Worker 2Lock 2On 2Off 2Signature 2
Worker 3Lock 3On 3Off 3Signature 3

Release

1. Tools removed; guards replaced; equipment intact.

2. All employees clear of the equipment and notified.

3. Each employee removes only his or her own lock.

4. Energy restored and equipment tested.

Released by: Authorized Employee Signature

Date and time of release: Release Date and Time

This permit supports, but does not replace, the written energy control program required by OSHA's lockout/tagout standard (29 CFR 1910.147).

Fill it in and download →

Frequently asked questions

Do I need an account to use this template?

Start right away and fill it in in your browser; signing in is needed to download or print. It takes seconds, and every new account gets free points.

How do I save it once filled in?

Fill in the blanks online, then print it or save it as PDF. An editable Word file is 15 points.

Are my files private?

Your files are kept in private storage no one else can reach, and are deleted from the servers automatically within two days at most.

Related templates