Hospitals & healthcare
Preventive maintenance report template (China)
A general template under the law of the People's Republic of China (mainland). The Chinese text governs; the English is its translation. Some rules differ from city to city, so check it with a lawyer licensed in China. We are not a law firm and do not give legal advice.
Fill in this template- Written for Chinese law, in Chinese and English
- Fill the blanks in your browser
- Print or save as PDF; Word is 15 points
- Start right away, sign in to download
Preview — China standard
Preventive Maintenance (PM) Report
Work order No.: Work Order Number; Facility: Facility Name; PM date: PM Date; Technician: Technician Name
1. Equipment
Device: Device Name; Manufacturer and model: Manufacturer and Model; Serial number: Serial Number; Asset number: Asset Number; Department and location: Department and Location; PM procedure: Procedure Number or Manufacturer Procedure; PM interval: PM Interval
2. Checklist
| Item | Result | Notes |
| Physical condition: housing, mounts, casters, cables | Result 1 | Notes 1 |
| Controls, displays and indicators | Result 2 | Notes 2 |
| Alarms: audible and visual | Result 3 | Notes 3 |
| Battery condition and run time | Result 4 | Notes 4 |
| Filters cleaned or replaced | Result 5 | Notes 5 |
| Parts replaced per manufacturer schedule | Result 6 | Notes 6 |
| Software version | Software Version | Notes 7 |
| Device-Specific Check | Result 8 | Notes 8 |
3. Measurements
| Parameter | Setting | Measured | Tolerance | Result |
| Parameter 1 | Setting 1 | Measured 1 | Tolerance 1 | Result of Parameter 1 |
| Parameter 2 | Setting 2 | Measured 2 | Tolerance 2 | Result of Parameter 2 |
| Electrical safety: ground resistance | Measured Ground Resistance | Ground Resistance Limit | Ground Resistance Result | |
| Electrical safety: leakage current | Measured Leakage Current | Leakage Current Limit | Leakage Current Result |
Test equipment: Analyzer Model, Serial Number and Calibration Due Date
4. Parts Used
Parts Used or None
5. Conclusion
Passed, Passed after Repair, or Failed and Removed from Service
Next PM due: Next PM Date; PM label applied: Label Applied or Not
This record is filed in accordance with the Measures for the Supervision and Administration of Medical Device Use Quality and the facility's equipment management rules.
Technician (signature): Technician Signature; Reviewer (signature): Reviewer Signature
Frequently asked questions
Do I need an account to use this template?
Start right away and fill it in in your browser; signing in is needed to download or print. It takes seconds, and every new account gets free points.
How do I save it once filled in?
Fill in the blanks online, then print it or save it as PDF. An editable Word file is 15 points.
Are my files private?
Your files are kept in private storage no one else can reach, and are deleted from the servers automatically within two days at most.
