← All templates

Construction & contracting

Site handover record template (US)

A general template under US law. Laws differ from state to state, so check it against your state's law or with a lawyer licensed there. We are not a law firm and do not give legal advice.

Fill in this template
  • Written for US law, with your state left to fill in
  • Fill the blanks in your browser
  • Print or save as PDF; Word is 15 points
  • Start right away, sign in to download

Preview — US standard

Construction Site Handover Certificate

Project: Project Name

Site address: Site Address

Contract number and date: Contract Number and Date

Owner: Owner Name

Contractor: Contractor Name, license number Contractor License Number

Architect or engineer: Architect or Engineer Name

Type of Handover

Owner hands the site to Contractor to start work

Contractor hands the completed work to Owner (substantial completion)

Partial handover of: Portion Handed Over

Handover date: Handover Date

Condition of Site

Description of the Site Condition, Existing Structures, Utilities and Access

Photos attached: Number of Photos

Items Handed Over

ItemQuantity or DescriptionCondition
Keys and access cardsKeys DescriptionKeys Condition
As-built drawingsDrawings DescriptionDrawings Condition
Operation and maintenance manualsManuals DescriptionManuals Condition
WarrantiesWarranties DescriptionWarranties Condition
Other ItemOther DescriptionOther Condition

Utility Meter Readings

Electric: Electric Meter Reading

Water: Water Meter Reading

Gas: Gas Meter Reading

Permits and Inspections

Building permit number: Building Permit Number

Certificate of occupancy: Certificate of Occupancy Number and Date, or Pending

Final inspections passed: Inspections Passed

Open Items

Punch list items to be completed by Punch List Completion Date are listed in the attached punch list. This handover does not waive Owner's rights to have those items, latent defects or warranty items corrected.

Responsibility

From the handover date, responsibility for site security, insurance, utilities and maintenance of the handed-over area passes to Receiving Party, except for work Contractor still has to perform.

Warranty and Retainage

The one-year correction period and other warranties begin on Warranty Start Date. Retainage of $Retainage Amount will be released on Retainage Release Conditions, subject to any lien waivers and state prompt-payment law.

Delivered ByReceived ByWitness (Architect or Engineer)
Delivering Party Name and SignatureReceiving Party Name and SignatureWitness Name and Signature
Date: Delivering Party DateDate: Receiving Party DateDate: Witness Date

Fill it in and download →

Frequently asked questions

Do I need an account to use this template?

Start right away and fill it in in your browser; signing in is needed to download or print. It takes seconds, and every new account gets free points.

How do I save it once filled in?

Fill in the blanks online, then print it or save it as PDF. An editable Word file is 15 points.

Are my files private?

Your files are kept in private storage no one else can reach, and are deleted from the servers automatically within two days at most.

Related templates