Construction & contracting
Site handover record template (US)
A general template under US law. Laws differ from state to state, so check it against your state's law or with a lawyer licensed there. We are not a law firm and do not give legal advice.
Fill in this template- Written for US law, with your state left to fill in
- Fill the blanks in your browser
- Print or save as PDF; Word is 15 points
- Start right away, sign in to download
Preview — US standard
Construction Site Handover Certificate
Project: Project Name
Site address: Site Address
Contract number and date: Contract Number and Date
Owner: Owner Name
Contractor: Contractor Name, license number Contractor License Number
Architect or engineer: Architect or Engineer Name
Type of Handover
Owner hands the site to Contractor to start work
Contractor hands the completed work to Owner (substantial completion)
Partial handover of: Portion Handed Over
Handover date: Handover Date
Condition of Site
Description of the Site Condition, Existing Structures, Utilities and Access
Photos attached: Number of Photos
Items Handed Over
| Item | Quantity or Description | Condition |
| Keys and access cards | Keys Description | Keys Condition |
| As-built drawings | Drawings Description | Drawings Condition |
| Operation and maintenance manuals | Manuals Description | Manuals Condition |
| Warranties | Warranties Description | Warranties Condition |
| Other Item | Other Description | Other Condition |
Utility Meter Readings
Electric: Electric Meter Reading
Water: Water Meter Reading
Gas: Gas Meter Reading
Permits and Inspections
Building permit number: Building Permit Number
Certificate of occupancy: Certificate of Occupancy Number and Date, or Pending
Final inspections passed: Inspections Passed
Open Items
Punch list items to be completed by Punch List Completion Date are listed in the attached punch list. This handover does not waive Owner's rights to have those items, latent defects or warranty items corrected.
Responsibility
From the handover date, responsibility for site security, insurance, utilities and maintenance of the handed-over area passes to Receiving Party, except for work Contractor still has to perform.
Warranty and Retainage
The one-year correction period and other warranties begin on Warranty Start Date. Retainage of $Retainage Amount will be released on Retainage Release Conditions, subject to any lien waivers and state prompt-payment law.
| Delivered By | Received By | Witness (Architect or Engineer) |
| Delivering Party Name and Signature | Receiving Party Name and Signature | Witness Name and Signature |
| Date: Delivering Party Date | Date: Receiving Party Date | Date: Witness Date |
Frequently asked questions
Do I need an account to use this template?
Start right away and fill it in in your browser; signing in is needed to download or print. It takes seconds, and every new account gets free points.
How do I save it once filled in?
Fill in the blanks online, then print it or save it as PDF. An editable Word file is 15 points.
Are my files private?
Your files are kept in private storage no one else can reach, and are deleted from the servers automatically within two days at most.