Construction & contracting
Electrical and plumbing works contract template (China)
A general template under the law of the People's Republic of China (mainland). The Chinese text governs; the English is its translation. Some rules differ from city to city, so check it with a lawyer licensed in China. We are not a law firm and do not give legal advice.
Fill in this template- Written for Chinese law, in Chinese and English
- Preview the first clauses; open the full contract after signing in
- Print or save as PDF; Word is 15 points
- Start right away, sign in to download
Preview — China standard
Electrical and Plumbing Installation Contract
Contract No.: Contract Number
Date signed: Date Signed
Party A (Employer): Party A Name
Resident ID Card No. or Unified Social Credit Code: Party A ID Number
Address: Party A Address
Telephone: Party A Telephone
Party B (Contractor): Party B Name
Unified Social Credit Code: Party B Unified Social Credit Code
Qualification certificate No.: Qualification Certificate Number
Legal Representative: Party B Legal Representative
Address: Party B Address
Under the Civil Code and the Construction Law of the PRC and other regulations, the parties enter into this Contract for electrical and plumbing installation works.
1. Works
Location: Site Location
Scope: Scope, such as power and low-voltage wiring, water supply and drainage piping and sanitary fixtures
Contracting method: Method, such as labor and materials, or labor only
Drawings and bill of materials: see attachments.
2. Schedule
Start date: Start Date
Completion date: Completion Date
Delays caused by Party A or force majeure extend the schedule accordingly.
3. Price and Payment
Contract price: RMB Contract Price (in words: Contract Price in Words).
| Milestone | Percentage | Amount (RMB) |
| On signing | First Percentage% | First Amount |
| After acceptance of concealed works | Interim Percentage% | Interim Amount |
| After completion acceptance | Completion Percentage% | Completion Amount |
| After the warranty period | Retention Percentage% | Retention Amount |
Party B shall issue invoices as required.
4. Materials
Materials supplied by Party B shall meet national standards and carry certificates of conformity. Brands and specifications of wires, switches and pipes: Material Brands and Specifications. Party B shall inspect materials supplied by Party A before use and inform Party A promptly of any that are substandard.
Frequently asked questions
Do I need an account to use this contract?
Start right away: the contract's first clauses are open to preview and fill in in your browser; signing in is needed to open the whole contract, download or print it. It takes seconds, and every new account gets free points.
How do I save it once filled in?
Fill in the blanks online, then print it or save it as PDF. An editable Word file is 15 points.
Are my files private?
Your files are kept in private storage no one else can reach, and are deleted from the servers automatically within two days at most.
