← All templates

Construction & contracting

Method statement template (China)

A general template under the law of the People's Republic of China (mainland). The Chinese text governs; the English is its translation. Some rules differ from city to city, so check it with a lawyer licensed in China. We are not a law firm and do not give legal advice.

Fill in this template
  • Written for Chinese law, in Chinese and English
  • Fill the blanks in your browser
  • Print or save as PDF; Word is 15 points
  • Start right away, sign in to download

Preview — China standard

Construction Method Statement

Project: Project Name; Statement No.: Statement Number; Revision: Revision

Contractor: Contractor; Prepared by: Prepared By; Date prepared: Date Prepared

1. Project Overview and Scope

Overview and Scope of the Work Package

2. References

• Construction Law, Work Safety Law and Regulations on Work Safety for Construction Projects of the People's Republic of China

• Provisions on Safety Management of Hazardous Sub-Projects (if applicable)

• Drawings and applicable national and industry standards: Applicable Standards

3. Organization and Responsibilities

RoleNameResponsibility
Project managerProject ManagerOverall responsibility
Technical leadTechnical LeadTechnical briefing and implementation
Full-time safety officerSafety OfficerSite safety supervision
Site engineerSite EngineerSite organization

4. Resources

Personnel: Workers and Certifications

Plant and equipment: Equipment

Materials: Main Materials

5. Sequence of Work

1. Step 1

2. Step 2

3. Step 3

6. Hazards and Controls

HazardRisk LevelControls
Hazard 1Risk Level 1Controls 1
Hazard 2Risk Level 2Controls 2

7. Personal Protective Equipment

PPE Requirements

8. Quality Control

Quality Standards, Inspection Lot Acceptance and Supervision Requirements

9. Emergency Arrangements

Emergency contact: Emergency Contact; Phone: Emergency Phone; Nearest hospital: Nearest Hospital

Emergency Response Measures

10. Site Management and Environment

Dust, Noise and Waste Controls

Approval

Prepared by: Prepared By; Reviewed by contractor's technical head: Reviewer

Approved by chief supervising engineer: Chief Supervising Engineer; Date approved: Approval Date

(For hazardous sub-projects above the prescribed scale, the statement must be reviewed by an expert panel.)

Fill it in and download →

Frequently asked questions

Do I need an account to use this template?

Start right away and fill it in in your browser; signing in is needed to download or print. It takes seconds, and every new account gets free points.

How do I save it once filled in?

Fill in the blanks online, then print it or save it as PDF. An editable Word file is 15 points.

Are my files private?

Your files are kept in private storage no one else can reach, and are deleted from the servers automatically within two days at most.

Related templates