Construction Method Statement
Project: Project Name; Statement No.: Statement Number; Revision: Revision
Contractor: Contractor; Prepared by: Prepared By; Date prepared: Date Prepared
1. Project Overview and Scope
Overview and Scope of the Work Package
2. References
• Construction Law, Work Safety Law and Regulations on Work Safety for Construction Projects of the People's Republic of China
• Provisions on Safety Management of Hazardous Sub-Projects (if applicable)
• Drawings and applicable national and industry standards: Applicable Standards
3. Organization and Responsibilities
| Role | Name | Responsibility |
| Project manager | Project Manager | Overall responsibility |
| Technical lead | Technical Lead | Technical briefing and implementation |
| Full-time safety officer | Safety Officer | Site safety supervision |
| Site engineer | Site Engineer | Site organization |
4. Resources
Personnel: Workers and Certifications
Plant and equipment: Equipment
Materials: Main Materials
5. Sequence of Work
1. Step 1
2. Step 2
3. Step 3
6. Hazards and Controls
| Hazard | Risk Level | Controls |
| Hazard 1 | Risk Level 1 | Controls 1 |
| Hazard 2 | Risk Level 2 | Controls 2 |
7. Personal Protective Equipment
PPE Requirements
8. Quality Control
Quality Standards, Inspection Lot Acceptance and Supervision Requirements
9. Emergency Arrangements
Emergency contact: Emergency Contact; Phone: Emergency Phone; Nearest hospital: Nearest Hospital
Emergency Response Measures
10. Site Management and Environment
Dust, Noise and Waste Controls
Approval
Prepared by: Prepared By; Reviewed by contractor's technical head: Reviewer
Approved by chief supervising engineer: Chief Supervising Engineer; Date approved: Approval Date
(For hazardous sub-projects above the prescribed scale, the statement must be reviewed by an expert panel.)
Frequently asked questions
Do I need an account to use this template?
Start right away and fill it in in your browser; signing in is needed to download or print. It takes seconds, and every new account gets free points.
How do I save it once filled in?
Fill in the blanks online, then print it or save it as PDF. An editable Word file is 15 points.
Are my files private?
Your files are kept in private storage no one else can reach, and are deleted from the servers automatically within two days at most.