Construction & contracting
Shop drawing submittal template (China)
A general template under the law of the People's Republic of China (mainland). The Chinese text governs; the English is its translation. Some rules differ from city to city, so check it with a lawyer licensed in China. We are not a law firm and do not give legal advice.
Fill in this template- Written for Chinese law, in Chinese and English
- Fill the blanks in your browser
- Print or save as PDF; Word is 15 points
- Start right away, sign in to download
Preview — China standard
Shop Drawing Submittal
Submittal number: Submittal Number
Revision: Revision
Project: Project Name
Contractor: Contractor
Subcontractor or fabricator: Subcontractor
Related drawing or specification section: Related Drawing or Specification Section
Date submitted: Submission Date
Reply requested by: Reply Date
1. Drawings Submitted
| Drawing no. | Title | Revision | Date |
| Drawing 1 | Title 1 | Revision 1 | Date 1 |
| Drawing 2 | Title 2 | Revision 2 | Date 2 |
| Drawing 3 | Title 3 | Revision 3 | Date 3 |
2. Deviations from the Construction Drawings and Contract Documents
Deviations
3. Contractor's Review
We have checked and coordinated these shop drawings against the construction drawings, the contract documents and the other trades, and verified site dimensions; except for the deviations above, they comply with the requirements. Shop drawings must not alter the main structure or safety performance of the original design; any change goes through the design change procedure as required.
Project technical manager (signature): Contractor Reviewer Signature Date: Contractor Review Date
4. Supervising Engineer's Review
Conclusion: Supervisor Review Conclusion
Comments: Supervisor Review Comments
Specialist supervising engineer (signature): Supervising Engineer Signature Date: Supervisor Review Date
5. Design Institute (or Owner) Review
Conclusion: Design Review Conclusion
Comments: Design Review Comments
Design lead (signature): Design Lead Signature Date: Design Review Date
Note: Approval only confirms that the shop drawings are consistent with the design intent; it does not release the contractor from building in accordance with the contract documents or from responsibility for dimensions, quantities and construction quality.
Frequently asked questions
Do I need an account to use this template?
Start right away and fill it in in your browser; signing in is needed to download or print. It takes seconds, and every new account gets free points.
How do I save it once filled in?
Fill in the blanks online, then print it or save it as PDF. An editable Word file is 15 points.
Are my files private?
Your files are kept in private storage no one else can reach, and are deleted from the servers automatically within two days at most.
