Construction Site Handover Certificate
Project: Project Name
Site address: Site Address
Contract number and date: Contract Number and Date
Owner: Owner Name
Contractor: Contractor Name, qualification certificate no.: Contractor Qualification Certificate Number
Supervising firm: Supervising Firm Name
1. Type of Handover
Type: Handover Type (owner hands the site to the contractor to start work; contractor hands the completed works to the owner; partial handover)
Scope of partial handover (if applicable): Partial Handover Scope
Handover date: Handover Date
2. Condition of the Site
Site Condition Description (existing buildings, underground utilities, water and power connections, roads and hoarding, etc.)
Number of photos: Number of Photos
3. Items Handed Over
| Item | Quantity or description | Condition |
| Keys and access cards | Keys Description | Keys Condition |
| As-built drawings | Drawings Description | Drawings Condition |
| Operation and maintenance manuals | Manuals Description | Manuals Condition |
| Quality warranty letter and equipment warranties | Warranty Documents Description | Warranty Documents Condition |
| Other Item | Other Item Description | Other Item Condition |
4. Meter Readings
Water: Water Meter Reading Electricity: Electricity Meter Reading Gas: Gas Meter Reading
5. Outstanding Work and Defects
Outstanding Work and Defects (deadline for correction: Correction Deadline)
6. Completion Handover Note (if Applicable)
The works passed completion acceptance on Completion Acceptance Date. The contractor bears warranty responsibility under the Regulations on Quality Management of Construction Projects, and the warranty period runs from the date of passing completion acceptance: Warranty Period. The owner will file the completion acceptance record as the law requires.
7. Signatures
Owner's representative (signature): Owner Representative Signature Seal Date: Owner Signature Date
Contractor's representative (signature): Contractor Representative Signature Seal Date: Contractor Signature Date
Supervising firm's representative (signature): Supervisor Representative Signature Seal Date: Supervisor Signature Date
Frequently asked questions
Do I need an account to use this template?
Start right away and fill it in in your browser; signing in is needed to download or print. It takes seconds, and every new account gets free points.
How do I save it once filled in?
Fill in the blanks online, then print it or save it as PDF. An editable Word file is 15 points.
Are my files private?
Your files are kept in private storage no one else can reach, and are deleted from the servers automatically within two days at most.