Construction Site Handover Certificate

Project: Project Name

Site address: Site Address

Contract number and date: Contract Number and Date

Owner: Owner Name

Contractor: Contractor Name, qualification certificate no.: Contractor Qualification Certificate Number

Supervising firm: Supervising Firm Name

1. Type of Handover

Type: Handover Type (owner hands the site to the contractor to start work; contractor hands the completed works to the owner; partial handover)

Scope of partial handover (if applicable): Partial Handover Scope

Handover date: Handover Date

2. Condition of the Site

Site Condition Description (existing buildings, underground utilities, water and power connections, roads and hoarding, etc.)

Number of photos: Number of Photos

3. Items Handed Over

ItemQuantity or descriptionCondition
Keys and access cardsKeys DescriptionKeys Condition
As-built drawingsDrawings DescriptionDrawings Condition
Operation and maintenance manualsManuals DescriptionManuals Condition
Quality warranty letter and equipment warrantiesWarranty Documents DescriptionWarranty Documents Condition
Other ItemOther Item DescriptionOther Item Condition

4. Meter Readings

Water: Water Meter Reading Electricity: Electricity Meter Reading Gas: Gas Meter Reading

5. Outstanding Work and Defects

Outstanding Work and Defects (deadline for correction: Correction Deadline)

6. Completion Handover Note (if Applicable)

The works passed completion acceptance on Completion Acceptance Date. The contractor bears warranty responsibility under the Regulations on Quality Management of Construction Projects, and the warranty period runs from the date of passing completion acceptance: Warranty Period. The owner will file the completion acceptance record as the law requires.

7. Signatures

Owner's representative (signature): Owner Representative Signature Seal Date: Owner Signature Date

Contractor's representative (signature): Contractor Representative Signature Seal Date: Contractor Signature Date

Supervising firm's representative (signature): Supervisor Representative Signature Seal Date: Supervisor Signature Date

Fill it in and download →

Frequently asked questions

Do I need an account to use this template?

Start right away and fill it in in your browser; signing in is needed to download or print. It takes seconds, and every new account gets free points.

How do I save it once filled in?

Fill in the blanks online, then print it or save it as PDF. An editable Word file is 15 points.

Are my files private?

Your files are kept in private storage no one else can reach, and are deleted from the servers automatically within two days at most.

Related templates