Concrete Pour Checklist and Release
Project: Project Name
Project number: Project Number
Location of pour: Grid Lines, Level and Element, such as Slab on Grade, Area B
Planned pour date and time: Pour Date and Time
Estimated volume: Cubic Yards cubic yards
Mix design: Mix Design Number and Strength, such as 4,000 psi
Supplier: Ready-Mix Supplier
Placement method: Pump, Chute or Bucket
Pre-Pour Checks
| Item | Checked | By | Notes |
| Subgrade compacted and approved | Yes or No | Initials | Notes |
| Vapor barrier, if required | Yes or No | Initials | Notes |
| Formwork aligned, braced and clean | Yes or No | Initials | Notes |
| Reinforcing size, spacing, laps and cover per drawings | Yes or No | Initials | Notes |
| Embeds, anchor bolts and sleeves in place | Yes or No | Initials | Notes |
| Plumbing and electrical rough-in inspected | Yes or No | Initials | Notes |
| Required municipal inspection passed | Yes or No | Inspector and Date | Notes |
| Special inspector notified, if required | Yes or No | Initials | Notes |
| Testing lab scheduled for slump, air, temperature and cylinders | Yes or No | Lab Name | Notes |
| Weather and curing plan, including hot or cold weather measures | Yes or No | Initials | Notes |
| Pump setup, access and traffic control safe | Yes or No | Initials | Notes |
| Crew briefed on silica and concrete burn protection | Yes or No | Initials | Notes |
Release to Pour
| Trade or Role | Name | Signature | Date |
| Concrete subcontractor | Name 1 | Signature 1 | Date 1 |
| MEP subcontractors | Name 2 | Signature 2 | Date 2 |
| General contractor superintendent | Name 3 | Signature 3 | Date 3 |
| Engineer of record or inspector, if required | Name 4 | Signature 4 | Date 4 |
Pour Record
Actual start and finish: Start and Finish Times
Actual volume: Actual Cubic Yards
Delivery tickets: Ticket Numbers
Test cylinders taken: Number and Set ID
Problems noted: Problems or None
Frequently asked questions
Do I need an account to use this template?
Start right away and fill it in in your browser; signing in is needed to download or print. It takes seconds, and every new account gets free points.
How do I save it once filled in?
Fill in the blanks online, then print it or save it as PDF. An editable Word file is 15 points.
Are my files private?
Your files are kept in private storage no one else can reach, and are deleted from the servers automatically within two days at most.