Construction & contracting
Method statement template (US)
A general template under US law. Laws differ from state to state, so check it against your state's law or with a lawyer licensed there. We are not a law firm and do not give legal advice.
Fill in this template- Written for US law, with your state left to fill in
- Fill the blanks in your browser
- Print or save as PDF; Word is 15 points
- Start right away, sign in to download
Preview — US standard
Method Statement
Project: Project Name
Activity: Activity, such as Installation of Precast Concrete Panels
Document number: Document Number
Revision: Revision
Prepared by: Preparer Name and Title
Date: Date
1. Scope
Scope of Work Covered by This Statement
2. References
Drawings, Specifications, Manufacturer Instructions, OSHA Standards and Permits
3. Responsibilities
| Role | Name | Responsibility |
| Project manager | Name 1 | Responsibility 1 |
| Superintendent | Name 2 | Responsibility 2 |
| Safety representative | Name 3 | Responsibility 3 |
| Crew foreman | Name 4 | Responsibility 4 |
| Competent or qualified person | Name 5 | Responsibility 5 |
4. Resources
Manpower: Crew Size and Trades
Equipment: Equipment, such as Crane, Lifts, Tools
Materials: Materials
5. Sequence of Work
1. Step 1
2. Step 2
3. Step 3
4. Step 4
5. Step 5
6. Step 6
6. Hazards and Controls
| Hazard | Control |
| Hazard 1, such as Falls from Height | Control 1, such as Guardrails or Personal Fall Arrest |
| Hazard 2, such as Suspended Loads | Control 2, such as Lift Plan, Qualified Rigger and Signal Person, Exclusion Zone |
| Hazard 3 | Control 3 |
Job hazard analysis reference: JHA Number
7. PPE
Required PPE
8. Quality Control
Inspections, Hold Points, Tests and Records
9. Emergency Arrangements
First Aid, Rescue Plan, Emergency Contacts and Nearest Hospital
10. Environmental Controls
Dust, Noise, Stormwater and Waste Controls
Approval
| Role | Name | Signature | Date |
| Prepared by | Preparer | Signature 1 | Date 1 |
| Reviewed by safety | Reviewer | Signature 2 | Date 2 |
| Approved by | Approver | Signature 3 | Date 3 |
Frequently asked questions
Do I need an account to use this template?
Start right away and fill it in in your browser; signing in is needed to download or print. It takes seconds, and every new account gets free points.
How do I save it once filled in?
Fill in the blanks online, then print it or save it as PDF. An editable Word file is 15 points.
Are my files private?
Your files are kept in private storage no one else can reach, and are deleted from the servers automatically within two days at most.
