Companies & business
Works acceptance certificate template (US)
A general template under US law. Laws differ from state to state, so check it against your state's law or with a lawyer licensed there. We are not a law firm and do not give legal advice.
Fill in this template- Written for US law, with your state left to fill in
- Fill the blanks in your browser
- Print or save as PDF; Word is 15 points
- Start right away, sign in to download
Preview — US standard
Certificate of Substantial Completion
Project: Project Name
Project address: Project Address
Owner: Owner Name
Contractor: Contractor Name
Architect or engineer: Architect Name
Contract date: Contract Date
Certificate type: Substantial Completion or Final Completion
Certification
The work performed under the contract has been reviewed and found, to the best of the architect's knowledge, to be Substantially Complete or Finally Complete. Substantial completion is the stage when the work, or a designated part of it, is complete enough for the owner to occupy or use it for its intended purpose.
Portion of work covered: Entire Project or Portion Described
Date of substantial completion: Substantial Completion Date
Punch List
A list of items to be completed or corrected is attached. The contractor will finish them within Punch List Days days.
Warranties
Warranties begin on Warranty Start Date, Usually the Date of Substantial Completion, unless otherwise stated: Exceptions
Responsibilities after this Date
| Item | Owner | Contractor |
| Security | Responsibility | Responsibility |
| Utilities | Responsibility | Responsibility |
| Insurance | Responsibility | Responsibility |
| Maintenance | Responsibility | Responsibility |
Remaining Payment
Retainage and final payment are released under the contract after completion of the punch list, delivery of close-out documents (as-built drawings, manuals, warranties, final lien waivers) and any required certificate of occupancy.
| Architect | Contractor | Owner |
| Architect Signature | Contractor Signature | Owner Signature |
| Architect Name | Contractor Name | Owner Name |
| Date: Architect Date | Date: Contractor Date | Date: Owner Date |
Frequently asked questions
Do I need an account to use this template?
Start right away and fill it in in your browser; signing in is needed to download or print. It takes seconds, and every new account gets free points.
How do I save it once filled in?
Fill in the blanks online, then print it or save it as PDF. An editable Word file is 15 points.
Are my files private?
Your files are kept in private storage no one else can reach, and are deleted from the servers automatically within two days at most.