← All templates

Construction & contracting

Method statement template (US)

A general template under US law. Laws differ from state to state, so check it against your state's law or with a lawyer licensed there. We are not a law firm and do not give legal advice.

Fill in this template
  • Written for US law, with your state left to fill in
  • Fill the blanks in your browser
  • Print or save as PDF; Word is 15 points
  • Start right away, sign in to download

Preview — US standard

Method Statement

Project: Project Name

Activity: Activity, such as Installation of Precast Concrete Panels

Document number: Document Number

Revision: Revision

Prepared by: Preparer Name and Title

Date: Date

1. Scope

Scope of Work Covered by This Statement

2. References

Drawings, Specifications, Manufacturer Instructions, OSHA Standards and Permits

3. Responsibilities

RoleNameResponsibility
Project managerName 1Responsibility 1
SuperintendentName 2Responsibility 2
Safety representativeName 3Responsibility 3
Crew foremanName 4Responsibility 4
Competent or qualified personName 5Responsibility 5

4. Resources

Manpower: Crew Size and Trades

Equipment: Equipment, such as Crane, Lifts, Tools

Materials: Materials

5. Sequence of Work

1. Step 1

2. Step 2

3. Step 3

4. Step 4

5. Step 5

6. Step 6

6. Hazards and Controls

HazardControl
Hazard 1, such as Falls from HeightControl 1, such as Guardrails or Personal Fall Arrest
Hazard 2, such as Suspended LoadsControl 2, such as Lift Plan, Qualified Rigger and Signal Person, Exclusion Zone
Hazard 3Control 3

Job hazard analysis reference: JHA Number

7. PPE

Required PPE

8. Quality Control

Inspections, Hold Points, Tests and Records

9. Emergency Arrangements

First Aid, Rescue Plan, Emergency Contacts and Nearest Hospital

10. Environmental Controls

Dust, Noise, Stormwater and Waste Controls

Approval

RoleNameSignatureDate
Prepared byPreparerSignature 1Date 1
Reviewed by safetyReviewerSignature 2Date 2
Approved byApproverSignature 3Date 3

Fill it in and download →

Frequently asked questions

Do I need an account to use this template?

Start right away and fill it in in your browser; signing in is needed to download or print. It takes seconds, and every new account gets free points.

How do I save it once filled in?

Fill in the blanks online, then print it or save it as PDF. An editable Word file is 15 points.

Are my files private?

Your files are kept in private storage no one else can reach, and are deleted from the servers automatically within two days at most.

Related templates