Concrete Pour Checklist and Release

Project: Project Name

Project number: Project Number

Location of pour: Grid Lines, Level and Element, such as Basement Level 1 Raft Slab, Area B

Planned pour date and time: Pour Date and Time

Estimated volume: Estimated Volume cubic meters

Mix design and strength grade: Mix Design Number and Strength Grade, such as C30

Supplier: Ready-Mix Concrete Supplier

Placement method: Pump, Chute or Bucket

1. Pre-Pour Checks

ItemPassedChecked ByNotes
Subgrade or blinding layer acceptedItem 1 PassedItem 1 CheckerItem 1 Notes
Formwork aligned, braced and cleanItem 2 PassedItem 2 CheckerItem 2 Notes
Reinforcement size, spacing, laps and cover per drawings; concealed work acceptedItem 3 PassedItem 3 CheckerItem 3 Notes
Embeds, anchor bolts and sleeves in placeItem 4 PassedItem 4 CheckerItem 4 Notes
Embedded plumbing and electrical conduits checkedItem 5 PassedItem 5 CheckerItem 5 Notes
Supervision engineer inspected and issued pour permitItem 6 PassedSupervision Engineer and DateItem 6 Notes
Testing staff arranged for slump, temperature and test cubesItem 7 PassedTesting LaboratoryItem 7 Notes
Weather and curing plan, including hot or winter construction measuresItem 8 PassedItem 8 CheckerItem 8 Notes
Pump setup, access and traffic control safeItem 9 PassedItem 9 CheckerItem 9 Notes
Crew given safety and technical briefingItem 10 PassedItem 10 CheckerItem 10 Notes

2. Release to Pour

Unit or RoleNameSignatureDate
Concrete subcontractorName 1Signature 1Date 1
MEP subcontractorName 2Signature 2Date 2
General contractor project technical leadName 3Signature 3Date 3
Supervision engineerName 4Signature 4Date 4

3. Pour Record

Actual start and finish: Actual Start and Finish Times

Actual volume: Actual Volume cubic meters

Delivery tickets: Delivery Ticket Numbers

Test cubes taken: Number of Sets and IDs

Problems noted: Problems or None

Fill it in and download →

Frequently asked questions

Do I need an account to use this template?

Start right away and fill it in in your browser; signing in is needed to download or print. It takes seconds, and every new account gets free points.

How do I save it once filled in?

Fill in the blanks online, then print it or save it as PDF. An editable Word file is 15 points.

Are my files private?

Your files are kept in private storage no one else can reach, and are deleted from the servers automatically within two days at most.

Related templates