Works acceptance certificate template (China)
A general template under the law of the People's Republic of China (mainland). The Chinese text governs; the English is its translation. Some rules differ from city to city, so check it with a lawyer licensed in China. We are not a law firm and do not give legal advice.
Fill in this template- Written for Chinese law, in Chinese and English
- Fill the blanks in your browser
- Print or save as PDF; Word is 15 points
- Start right away, sign in to download
Preview — China standard
Certificate of Completion Acceptance and Handover
Certificate No.: Certificate No.
| Item | Details |
| Project | Project Name |
| Location | Project Location |
| Construction Contract No. | Construction Contract No. |
| Owner (Employer) | Owner Name |
| Contractor | Contractor Name |
| Supervision Firm | Supervision Firm Name |
| Designer | Designer Name |
| Commencement Date | Commencement Date |
| Completion Acceptance Date | Completion Acceptance Date |
| Contract Price | RMB Contract Price |
1. Acceptance Conclusion
Under the Civil Code of the People's Republic of China and the Regulations on the Quality Management of Construction Projects, the owner organized the completion acceptance on Completion Acceptance Date with the designer, contractor, supervision firm and others. The project has been completed as designed and contracted, its quality is Quality Conclusion, such as Acceptable, and it is accepted and handed over for use. A construction project may be put into use only after it passes acceptance.
2. Outstanding Items
| No. | Outstanding Item | Responsible Party | Deadline |
| 1 | Outstanding Item 1 | Responsible Party 1 | Deadline 1 |
| 2 | Outstanding Item 2 | Responsible Party 2 | Deadline 2 |
3. Items Handed Over
The contractor hands over to the owner: the completed works, Number of Key Sets sets of keys, Number of Technical Documents sets of as-built drawings and technical documents, equipment manuals and warranty cards, and the construction quality warranty. The owner shall file the completion acceptance with the housing and urban-rural development authority where the project is located within fifteen days after acceptance, as the rules require.
4. Warranty
The warranty period runs from the date of acceptance, and the warranty for each part follows the minimum periods set by the Regulations on the Quality Management of Construction Projects and the construction quality warranty signed by the parties. Any retention money is withheld and released as the construction contract provides.
| Owner (seal) | Contractor (seal) | Supervision Firm (seal) |
| Project Lead (signature): Owner Lead Signature | Project Manager (signature): Project Manager Signature | Chief Supervising Engineer (signature): Chief Engineer Signature |
| Date: Owner Signing Date | Date: Contractor Signing Date | Date: Supervision Firm Signing Date |
Frequently asked questions
Do I need an account to use this template?
Start right away and fill it in in your browser; signing in is needed to download or print. It takes seconds, and every new account gets free points.
How do I save it once filled in?
Fill in the blanks online, then print it or save it as PDF. An editable Word file is 15 points.
Are my files private?
Your files are kept in private storage no one else can reach, and are deleted from the servers automatically within two days at most.