Construction & contracting
Subcontractor warning template (China)
A general template under the law of the People's Republic of China (mainland). The Chinese text governs; the English is its translation. Some rules differ from city to city, so check it with a lawyer licensed in China. We are not a law firm and do not give legal advice.
Fill in this template- Written for Chinese law, in Chinese and English
- Fill the blanks in your browser
- Print or save as PDF; Word is 15 points
- Start right away, sign in to download
Preview — China standard
Notice to Rectify
Ref. No.: Notice Number
To: Subcontractor Name
Project: Project Name
Subcontract No.: Subcontract Number
Our inspection on Inspection Date found the following problems in your work:
| No. | Problem | Contract Clause or Standard Breached | Rectification Required | Deadline |
| 1 | Problem 1 | Basis 1 | Requirement 1 | Deadline 1 |
| 2 | Problem 2 | Basis 2 | Requirement 2 | Deadline 2 |
| 3 | Problem 3 | Basis 3 | Requirement 3 | Deadline 3 |
Please complete the rectification within the above deadlines and report it to our project department in writing for re-inspection. If rectification is not made on time or is unsatisfactory, we will hold you liable under Clause Breach Clause of the subcontract, including Intended Measures, such as deducting the corresponding amounts, engaging a third party at your cost, or terminating the contract.
Where a safety hazard is involved, you shall stop the work concerned immediately and may resume only after the hazard is eliminated.
Project Department of Main Contractor Name (seal)
Project manager (signature): Project Manager Signature
Date: Notice Date
Acknowledgement of Receipt
Received for the subcontractor by (signature): Recipient Signature Date: Receipt Date
Frequently asked questions
Do I need an account to use this template?
Start right away and fill it in in your browser; signing in is needed to download or print. It takes seconds, and every new account gets free points.
How do I save it once filled in?
Fill in the blanks online, then print it or save it as PDF. An editable Word file is 15 points.
Are my files private?
Your files are kept in private storage no one else can reach, and are deleted from the servers automatically within two days at most.
