Construction & contracting
Snag list template (China)
A general template under the law of the People's Republic of China (mainland). The Chinese text governs; the English is its translation. Some rules differ from city to city, so check it with a lawyer licensed in China. We are not a law firm and do not give legal advice.
Fill in this template- Written for Chinese law, in Chinese and English
- Fill the blanks in your browser
- Print or save as PDF; Word is 15 points
- Start right away, sign in to download
Preview — China standard
Defects (Snag) List
Project: Project Name
Site address: Site Address
Contractor: Contractor Name
Inspected by: Inspector Name and Role
Inspection date: Inspection Date
Area or floor: Area or Floor
1. Items to Complete or Correct
| No. | Location | Defect | Trade | Responsible organization | Deadline | Completed and re-checked |
| 1 | Location 1 | Defect 1 | Trade 1 | Responsible 1 | Deadline 1 | Re-Check 1 |
| 2 | Location 2 | Defect 2 | Trade 2 | Responsible 2 | Deadline 2 | Re-Check 2 |
| 3 | Location 3 | Defect 3 | Trade 3 | Responsible 3 | Deadline 3 | Re-Check 3 |
| 4 | Location 4 | Defect 4 | Trade 4 | Responsible 4 | Deadline 4 | Re-Check 4 |
| 5 | Location 5 | Defect 5 | Trade 5 | Responsible 5 | Deadline 5 | Re-Check 5 |
| 6 | Location 6 | Defect 6 | Trade 6 | Responsible 6 | Deadline 6 | Re-Check 6 |
| 7 | Location 7 | Defect 7 | Trade 7 | Responsible 7 | Deadline 7 | Re-Check 7 |
| 8 | Location 8 | Defect 8 | Trade 8 | Responsible 8 | Deadline 8 | Re-Check 8 |
Total defects: Total Defects Photos: Number of Photos
2. Notes
1. The contractor must correct each item by its deadline and give written notice for re-checking; once a re-check passes, the inspector signs the "Completed and re-checked" column.
2. This list does not release the contractor from its responsibility under the contract and the Regulations on Quality Management of Construction Projects for the quality of the works and for defects during the warranty period; defects not listed are not deemed accepted.
3. Correction of all defects and passing re-check is one of the conditions for completion acceptance and payment of the corresponding contract sum.
Inspector (signature): Inspector Signature
Contractor's representative (signature): Contractor Representative Signature Date: Contractor Receipt Date
Owner's representative (signature): Owner Representative Signature Date: Owner Signature Date
Frequently asked questions
Do I need an account to use this template?
Start right away and fill it in in your browser; signing in is needed to download or print. It takes seconds, and every new account gets free points.
How do I save it once filled in?
Fill in the blanks online, then print it or save it as PDF. An editable Word file is 15 points.
Are my files private?
Your files are kept in private storage no one else can reach, and are deleted from the servers automatically within two days at most.
